Initial Planning Notes
Date July 27, 2022
Participants @Luke Solomon @Hunter Larco Chloe
Topics
- Tickets
- WAP
- Logistics of the moving the structure
- Power
- MOOP
- Placement within frontage
Notes
- Chloe wants to join pre-build / needs to join so that she can support The Orb
- She’s also down to stay as long as possible to help tear down / drive it out
- Structure is in Berkley and is constructed on campus
- The courtyard it’s in has two big gates and we can move it using a small U-Haul from there
- Suggestion is to use a small U-Haul from Berkley to bring it to Palo Alto / our loading area
- We can put it into storage and bring it next year
- 2 meters (~7ft) in diameter.
- She’s thinking of making a new structure to support it at burning man.
- Should be about 10ft tall because it only needs 2-3 ft clearance
- Power requirements should be trivial, just needs a standard party light
- She knows what MOOP is and has a MOOP-free structure